DST S.A.
  • About Us
    • Who we are
    • History
    • Financial information
    • Certifications
    • Social Responsibility and Environment
    • Recruitment
    • MANAGEMENT POLICY
  • Activity Areas
  • Portfolio
    • All the areas
    • Construction
    • Infrastructures
    • Water, Environment and Energy
  • Works in progress
    • All the areas
    • Construction
    • Infrastructures
    • Water, environment and energy
  • Contact Us
  • en
    • English (US)
    • Português
    • Français
    • Español
Back
Beja
Hydraulic Infrastructures - S. Pedro-Baleizão Unit
Infraestruturas Hidráulicas
Data Sheet
Irrigation, road and drainage infrastructures of the São Pedro – Baleizão Unit. The Irrigation Unit of São Pedro - Baleizão covers a 6,035 ha area of irrigation through the installation of 76 hydrants. The contract includes the installation of 62.6 km of pipelines in various types of materials and diameters, namely HDPE (27.3 km, DN 150 to DN 600), DCI (12.1 km, DN 600 to DN 700) and PCCP (23.2 km, DN 800 to DN 1800). A filtration station was also designed and a remote management system was installed that allows real-time remote monitoring and control of flow rates and water pressures. This project also includes the execution of a road network composed of 15 km of access roads with bituminous layer and double surface coating and a drainage network for the upgrading of existing water lines.
+ learn more
Client
EDIA - Empresa de Desenvolvimento e Infra-Estruturas do Alqueva
Time of execution
540 days
Request Technical Data Sheet
Back
Beja
Hydraulic Infrastructures - S. Pedro-Baleizão Unit
Infraestruturas Hidráulicas
/
Data Sheet
Irrigation, road and drainage infrastructures of the São Pedro – Baleizão Unit. The Irrigation Unit of São Pedro - Baleizão covers a 6,035 ha area of irrigation through the installation of 76 hydrants. The contract includes the installation of 62.6 km of pipelines in various types of materials and diameters, namely HDPE (27.3 km, DN 150 to DN 600), DCI (12.1 km, DN 600 to DN 700) and PCCP (23.2 km, DN 800 to DN 1800). A filtration station was also designed and a remote management system was installed that allows real-time remote monitoring and control of flow rates and water pressures. This project also includes the execution of a road network composed of 15 km of access roads with bituminous layer and double surface coating and a drainage network for the upgrading of existing water lines.
+ learn more
Client
EDIA - Empresa de Desenvolvimento e Infra-Estruturas do Alqueva
Time of execution
540 days

TECHNICAL SHEET

Irrigation, road and drainage infrastructures of the São Pedro – Baleizão Unit. The Irrigation Unit of São Pedro - Baleizão covers a 6,035 ha area of irrigation through the installation of 76 hydrants. The contract includes the installation of 62.6 km of pipelines in various types of materials and diameters, namely HDPE (27.3 km, DN 150 to DN 600), DCI (12.1 km, DN 600 to DN 700) and PCCP (23.2 km, DN 800 to DN 1800). A filtration station was also designed and a remote management system was installed that allows real-time remote monitoring and control of flow rates and water pressures. This project also includes the execution of a road network composed of 15 km of access roads with bituminous layer and double surface coating and a drainage network for the upgrading of existing water lines.
Cliente
EDIA - Empresa de Desenvolvimento e Infra-Estruturas do Alqueva
Prazo de Execução
540 days
Technical Sheet Request

Call us

or

Write us

cofinacied by  
SetWidth480-compete2020.png
SetWidth480-portugal2020.png
SetWidth480-UE2020.png
Projetos Financiados ID&T
Baterias 2030
ReNew
New Generation Storage
 
SetWidth480-prr.png
SetWidth480-logo-RP-branco-Prancheta-1.png
SetWidth480-ue-next.png
PRR Portugal
R2UTechnologies | modular system
Follow us on social networks
Construction charter
DOMINGOS DA SILVA TEIXEIRA, S.A. 2846 - PUB
© 2022 dstgroup. All rights reserved. Privacy policy. Website developed by innovationpoint