Beja
Baleizão Quintos Hydraulic Circuit
Infraestruturas Hidráulicas
Data Sheet
The project consists of the Gravity Delivery System and the Estácio Reservoir. The Gravity Delivery System, with a total extension of 8,392 m, establishes the connection between the Magra dam and the Estácio terminal reservoir and is made of PCCP pipes of nominal diameters 2,500 mm and 2,150 mm, with the respective maximum design flow rate of about 7.2 m3 / s. Along its path it has a 4m wide service road with a crushed aggregate base. The Estácio Reservoir is built on a relatively flat slope, in excavation and landfill, with optimization of earthworks, with a height of 6 m and a total storage capacity of 119,592 m3. The total perimeter of the reservoir is 753 m and its internal area is 33,507 m2.
+ learn more
Client
EDIA - Empresa de Desenvolvimento e Infra-Estruturas do Alqueva, S.A.
Time of execution
420 days
Request Technical Data Sheet
Back
Beja
Baleizão Quintos Hydraulic Circuit
Infraestruturas Hidráulicas
/
Data Sheet
The project consists of the Gravity Delivery System and the Estácio Reservoir. The Gravity Delivery System, with a total extension of 8,392 m, establishes the connection between the Magra dam and the Estácio terminal reservoir and is made of PCCP pipes of nominal diameters 2,500 mm and 2,150 mm, with the respective maximum design flow rate of about 7.2 m3 / s. Along its path it has a 4m wide service road with a crushed aggregate base. The Estácio Reservoir is built on a relatively flat slope, in excavation and landfill, with optimization of earthworks, with a height of 6 m and a total storage capacity of 119,592 m3. The total perimeter of the reservoir is 753 m and its internal area is 33,507 m2.
+ learn more
Client
EDIA - Empresa de Desenvolvimento e Infra-Estruturas do Alqueva, S.A.
Time of execution
420 days

TECHNICAL SHEET

The project consists of the Gravity Delivery System and the Estácio Reservoir. The Gravity Delivery System, with a total extension of 8,392 m, establishes the connection between the Magra dam and the Estácio terminal reservoir and is made of PCCP pipes of nominal diameters 2,500 mm and 2,150 mm, with the respective maximum design flow rate of about 7.2 m3 / s. Along its path it has a 4m wide service road with a crushed aggregate base. The Estácio Reservoir is built on a relatively flat slope, in excavation and landfill, with optimization of earthworks, with a height of 6 m and a total storage capacity of 119,592 m3. The total perimeter of the reservoir is 753 m and its internal area is 33,507 m2.
Cliente
EDIA - Empresa de Desenvolvimento e Infra-Estruturas do Alqueva, S.A.
Prazo de Execução
420 days
Technical Sheet Request

Call us

or

Write us

cofinacied by  
SetWidth480-compete2020.png
SetWidth480-portugal2020.png
SetWidth480-UE2020.png
Projetos Financiados ID&T
Baterias 2030
ReNew
New Generation Storage
 
SetWidth480-prr.png
SetWidth480-logo-RP-branco-Prancheta-1.png
SetWidth480-ue-next.png
PRR Portugal
R2UTechnologies | modular system
Follow us on social networks
Construction charter
DOMINGOS DA SILVA TEIXEIRA, S.A. 2846 - PUB
© 2022 dstgroup. All rights reserved. Privacy policy. Website developed by innovationpoint