Mirandela
Nordeste Transmontano ORC
Infraestruturas Ambientais
Data Sheet
Unit for Organic Recovery of Biodegradable Urban Waste in the Nordeste Transmontano region. The main objective of the infrastructure is the recovery and treatment of 10.000 ton / year of BUW (Biodegradable Urban Waste), from the selective collection with biogas energy recovery, as well as the recovery of 55,000 ton / year of MSW (Municipal Solid Waste), produced in 13 municipalities of the region. The contract involves the design, construction and operation of the unit for 5 years, the unit involves an site area of ​​more than 50,000 m2, earthworks of more than 100,000 m3, the construction of gabion retaining walls for the creation of work platform with more than 20,000 m3, as well as the construction of 6 buildings, namely Administrative building, Site control office, Screening and Biodigestion, leachate treatment, Maturation / Composting and Correction.
+ learn more
Client
Resíduos Do Nordeste, EIM
Time of execution
200 days
Request Technical Data Sheet
Back
Mirandela
Nordeste Transmontano ORC
Infraestruturas Ambientais
/
Data Sheet
Unit for Organic Recovery of Biodegradable Urban Waste in the Nordeste Transmontano region. The main objective of the infrastructure is the recovery and treatment of 10.000 ton / year of BUW (Biodegradable Urban Waste), from the selective collection with biogas energy recovery, as well as the recovery of 55,000 ton / year of MSW (Municipal Solid Waste), produced in 13 municipalities of the region. The contract involves the design, construction and operation of the unit for 5 years, the unit involves an site area of ​​more than 50,000 m2, earthworks of more than 100,000 m3, the construction of gabion retaining walls for the creation of work platform with more than 20,000 m3, as well as the construction of 6 buildings, namely Administrative building, Site control office, Screening and Biodigestion, leachate treatment, Maturation / Composting and Correction.
+ learn more
Client
Resíduos Do Nordeste, EIM
Time of execution
200 days

TECHNICAL SHEET

Unit for Organic Recovery of Biodegradable Urban Waste in the Nordeste Transmontano region. The main objective of the infrastructure is the recovery and treatment of 10.000 ton / year of BUW (Biodegradable Urban Waste), from the selective collection with biogas energy recovery, as well as the recovery of 55,000 ton / year of MSW (Municipal Solid Waste), produced in 13 municipalities of the region. The contract involves the design, construction and operation of the unit for 5 years, the unit involves an site area of ​​more than 50,000 m2, earthworks of more than 100,000 m3, the construction of gabion retaining walls for the creation of work platform with more than 20,000 m3, as well as the construction of 6 buildings, namely Administrative building, Site control office, Screening and Biodigestion, leachate treatment, Maturation / Composting and Correction.
Cliente
Resíduos Do Nordeste, EIM
Prazo de Execução
200 days
Technical Sheet Request

Call us

or

Write us

cofinacied by  
SetWidth480-compete2020.png
SetWidth480-portugal2020.png
SetWidth480-UE2020.png
Projetos Financiados ID&T
Baterias 2030
ReNew
New Generation Storage
 
SetWidth480-prr.png
SetWidth480-logo-RP-branco-Prancheta-1.png
SetWidth480-ue-next.png
PRR Portugal
R2UTechnologies | modular system