DST S.A.
  • About Us
    • Who we are
    • History
    • Financial information
    • Certifications
    • Social Responsibility and Environment
    • Recruitment
    • MANAGEMENT POLICY
  • Activity Areas
  • Portfolio
    • All the areas
    • Construction
    • Infrastructures
    • Water, Environment and Energy
  • Works in progress
    • All the areas
    • Construction
    • Infrastructures
    • Water, environment and energy
  • Contact Us
  • en
    • English (US)
    • Português
    • Français
    • Español
Back
Vila Nova de Famalicão
Mixing Plant and surrounding area
Indústria e Logística
Data Sheet
The Mixing Building consisted in the expansion of Continental Mabor's tire industry facilities, with the construction of a new building with a plan area of 5,960 m2 that is developed on four floors (one of them below ground). It is a building characterized by a monolithic frame with continuous connections and without expansion joints, with three-dimensional portal frames, steel structure for adjacent pavilions and steel clad facades. The contract also included the installation of some electrical and mechanical equipment. All floors have industrial finishing with high strength natural hardener and in the compartmenting of the interior some 6,500 m2 of masonry was carried out. Further, 48,000 m2 of interior / exterior painting on walls and ceilings was also included in this contract.
+ learn more
Client
Continental Mabor
Request Technical Data Sheet
Back
Vila Nova de Famalicão
Mixing Plant and surrounding area
Indústria e Logística
/
Data Sheet
The Mixing Building consisted in the expansion of Continental Mabor's tire industry facilities, with the construction of a new building with a plan area of 5,960 m2 that is developed on four floors (one of them below ground). It is a building characterized by a monolithic frame with continuous connections and without expansion joints, with three-dimensional portal frames, steel structure for adjacent pavilions and steel clad facades. The contract also included the installation of some electrical and mechanical equipment. All floors have industrial finishing with high strength natural hardener and in the compartmenting of the interior some 6,500 m2 of masonry was carried out. Further, 48,000 m2 of interior / exterior painting on walls and ceilings was also included in this contract.
+ learn more
Client
Continental Mabor

TECHNICAL SHEET

The Mixing Building consisted in the expansion of Continental Mabor's tire industry facilities, with the construction of a new building with a plan area of 5,960 m2 that is developed on four floors (one of them below ground). It is a building characterized by a monolithic frame with continuous connections and without expansion joints, with three-dimensional portal frames, steel structure for adjacent pavilions and steel clad facades. The contract also included the installation of some electrical and mechanical equipment. All floors have industrial finishing with high strength natural hardener and in the compartmenting of the interior some 6,500 m2 of masonry was carried out. Further, 48,000 m2 of interior / exterior painting on walls and ceilings was also included in this contract.
Cliente
Continental Mabor
Technical Sheet Request

Call us

or

Write us

cofinacied by  
SetWidth480-compete2020.png
SetWidth480-portugal2020.png
SetWidth480-UE2020.png
Projetos Financiados ID&T
Baterias 2030
ReNew
New Generation Storage
 
SetWidth480-prr.png
SetWidth480-logo-RP-branco-Prancheta-1.png
SetWidth480-ue-next.png
PRR Portugal
R2UTechnologies | modular system
Follow us on social networks
Construction charter
DOMINGOS DA SILVA TEIXEIRA, S.A. 2846 - PUB
© 2022 dstgroup. All rights reserved. Privacy policy. Website developed by innovationpoint