Porto
Gas Pipeline Leg of Leça
Infraestruturas de Gás
Data Sheet
The contract involved the construction of the Leça Leg (Petrogal) - the Industrial Leg between Leça and Santo Tirso, along an overall extension of 23,213 m, with the installation of high pressure piping in carbon steel API 5L of DN 300 with wall thickness of 6.4mm / 9.5mm.
+ learn more
Client
Ensulmeci, S.A.
Time of execution
11 months