DST S.A.
  • About Us
    • Who we are
    • History
    • Financial information
    • Certifications
    • Social Responsibility and Environment
    • Recruitment
    • MANAGEMENT POLICY
  • Activity Areas
  • Portfolio
    • All the areas
    • Construction
    • Infrastructures
    • Water, Environment and Energy
  • Works in progress
    • All the areas
    • Construction
    • Infrastructures
    • Water, environment and energy
  • Contact Us
  • en
    • English (US)
    • Português
    • Français
    • Español
Back
Vieira do Minho - Braga
Alto da Vaca Wind Farm
Parques Eólicos
Data Sheet
The Alto da Vaca wind farm is located in the Cabreira Mountains, municipality of Vieira do Minho in the district of Braga. The wind farm is comprised of four E40 Enercon wind turbines, of 0.6 MW each, connected to the substation through underground electric cables, and thereafter connected to the REN substation by overhead lines. dst was the contractor for the civil works and Enercon’s subcontractor for construction of the wind turbine foundations. Enercon was the contractor for the wind turbines. The civil works comprised the construction of new roads and refurbishment of existing ones, building 4 E-40 foundations (concrete tower), construction of respective assembly platforms, excavation and backfill of cable trenches, construction of longitudinal and transverse drainage systems, construction of the switching station and environmental upgrading of works areas.
+ learn more
Client
Parque Eólico do Alto da Vaca, Lda.
Request Technical Data Sheet
Back
Vieira do Minho - Braga
Alto da Vaca Wind Farm
Parques Eólicos
/
Data Sheet
The Alto da Vaca wind farm is located in the Cabreira Mountains, municipality of Vieira do Minho in the district of Braga. The wind farm is comprised of four E40 Enercon wind turbines, of 0.6 MW each, connected to the substation through underground electric cables, and thereafter connected to the REN substation by overhead lines. dst was the contractor for the civil works and Enercon’s subcontractor for construction of the wind turbine foundations. Enercon was the contractor for the wind turbines. The civil works comprised the construction of new roads and refurbishment of existing ones, building 4 E-40 foundations (concrete tower), construction of respective assembly platforms, excavation and backfill of cable trenches, construction of longitudinal and transverse drainage systems, construction of the switching station and environmental upgrading of works areas.
+ learn more
Client
Parque Eólico do Alto da Vaca, Lda.

TECHNICAL SHEET

The Alto da Vaca wind farm is located in the Cabreira Mountains, municipality of Vieira do Minho in the district of Braga. The wind farm is comprised of four E40 Enercon wind turbines, of 0.6 MW each, connected to the substation through underground electric cables, and thereafter connected to the REN substation by overhead lines. dst was the contractor for the civil works and Enercon’s subcontractor for construction of the wind turbine foundations. Enercon was the contractor for the wind turbines. The civil works comprised the construction of new roads and refurbishment of existing ones, building 4 E-40 foundations (concrete tower), construction of respective assembly platforms, excavation and backfill of cable trenches, construction of longitudinal and transverse drainage systems, construction of the switching station and environmental upgrading of works areas.
Cliente
Parque Eólico do Alto da Vaca, Lda.
Technical Sheet Request

Call us

or

Write us

cofinacied by  
SetWidth480-compete2020.png
SetWidth480-portugal2020.png
SetWidth480-UE2020.png
Projetos Financiados ID&T
Baterias 2030
ReNew
New Generation Storage
 
SetWidth480-prr.png
SetWidth480-logo-RP-branco-Prancheta-1.png
SetWidth480-ue-next.png
PRR Portugal
R2UTechnologies | modular system
Follow us on social networks
Construction charter
DOMINGOS DA SILVA TEIXEIRA, S.A. 2846 - PUB
© 2022 dstgroup. All rights reserved. Privacy policy. Website developed by innovationpoint