Tavira
Malhanito Wind Farm
Água, Ambiente e Energia
Data Sheet
The Malhanito wind farm is subdivided into 5 centres: Fonte da Rata with 6 wind turbines, Malhanito with 3 wind turbines, Cerro do Gato with 5 wind turbines, Botaréu with 5 wind turbines and Passa-Frio with 10 wind turbines. With a total of 29 Enercon E-82 wind turbines, this wind farm is located in the parish of Cachopo, Tavira, and is connected to the REN substation in the same parish. dst was the contractor for the civil works and Enercon’s subcontractor for construction of wind turbine foundations. Other players were also involved in the construction of this sub-wind farm, namely Enercon (contractor for the wind turbines), Jayme da Costa (electrical contractor), CME and Paínhas (overhead cable contractors). The civil works comprised the construction of new roads and refurbishment of existing ones, building 29 E-82 foundations (concrete tower), construction of respective assembly platforms, excavation and backfill of cable trenches, construction of longitudinal and transverse drainage systems, construction of two control buildings and substations and environmental upgrading of works areas.
+ learn more
Client
Eneop 3 – Desenvolvimento de Projecto Industrial, SA