Arcos de Valdevez
  Polipropigal Factory
  
    Indústria e Logística
    
    Data Sheet
    
        
Building constructed on pile foundations in 80% of the setting out area. The steel structure (approximately 2.000 T) ensures framework of the factory covered by prefabricated concrete panels. Reinforced concrete floors and deck type cover.
Execution of production support offices, various control rooms, loading and unloading docks and scales.
        Execution of production support offices, various control rooms, loading and unloading docks and scales.
+ learn more
    
  Client
  LIPROPIGAL, FABRICAÇÃO DE POLIPROPILENO, SA