DST S.A.
  • About Us
    • Who we are
    • History
    • Financial information
    • Certifications
    • Social Responsibility and Environment
    • Recruitment
    • MANAGEMENT POLICY
  • Activity Areas
  • Portfolio
    • All the areas
    • Construction
    • Infrastructures
    • Water, Environment and Energy
  • Works in progress
    • All the areas
    • Construction
    • Infrastructures
    • Water, environment and energy
  • Contact Us
  • en
    • English (US)
    • Português
    • Français
    • Español
Back
Abrantes
Steel bridge over the Tagus River
Obras de Arte
Data Sheet
Rehabilitation of the engineering structure. The bridge connects the two banks of the Tagus River with a total length of 368 m, including the abutments. The pillars and abutments are in granite masonry and are based on the rock (Metagrauvaques) with the exception of the P3 pillar that is founded in the alluvium and about 2 m from the rock layer. The structure is characterized by a box girder steel superstructure, with an upper tray, consisting of two longitudinal vertical truss beams with steel bracing (top, bottom and cross bracing), supporting a reinforced concrete deck.
The works consist of foundation reinforcement, the repair and reinforcement of the deck, the reinforcement and improvement of the steel superstructure, among other works such as paving, signalling, public lighting and accent lighting of the bridge's steel structure.
+ learn more
Client
Infraestruturas de Portugal, S.A.
Time of execution
540 days
Request Technical Data Sheet
Back
Abrantes
Steel bridge over the Tagus River
Obras de Arte
/
Data Sheet
Rehabilitation of the engineering structure. The bridge connects the two banks of the Tagus River with a total length of 368 m, including the abutments. The pillars and abutments are in granite masonry and are based on the rock (Metagrauvaques) with the exception of the P3 pillar that is founded in the alluvium and about 2 m from the rock layer. The structure is characterized by a box girder steel superstructure, with an upper tray, consisting of two longitudinal vertical truss beams with steel bracing (top, bottom and cross bracing), supporting a reinforced concrete deck.
The works consist of foundation reinforcement, the repair and reinforcement of the deck, the reinforcement and improvement of the steel superstructure, among other works such as paving, signalling, public lighting and accent lighting of the bridge's steel structure.
+ learn more
Client
Infraestruturas de Portugal, S.A.
Time of execution
540 days

TECHNICAL SHEET

Rehabilitation of the engineering structure. The bridge connects the two banks of the Tagus River with a total length of 368 m, including the abutments. The pillars and abutments are in granite masonry and are based on the rock (Metagrauvaques) with the exception of the P3 pillar that is founded in the alluvium and about 2 m from the rock layer. The structure is characterized by a box girder steel superstructure, with an upper tray, consisting of two longitudinal vertical truss beams with steel bracing (top, bottom and cross bracing), supporting a reinforced concrete deck.
The works consist of foundation reinforcement, the repair and reinforcement of the deck, the reinforcement and improvement of the steel superstructure, among other works such as paving, signalling, public lighting and accent lighting of the bridge's steel structure.
Cliente
Infraestruturas de Portugal, S.A.
Prazo de Execução
540 days
Technical Sheet Request

Call us

or

Write us

cofinacied by  
SetWidth480-compete2020.png
SetWidth480-portugal2020.png
SetWidth480-UE2020.png
Projetos Financiados ID&T
Baterias 2030
ReNew
New Generation Storage
 
SetWidth480-prr.png
SetWidth480-logo-RP-branco-Prancheta-1.png
SetWidth480-ue-next.png
PRR Portugal
R2UTechnologies | modular system
Follow us on social networks
Construction charter
DOMINGOS DA SILVA TEIXEIRA, S.A. 2846 - PUB
© 2022 dstgroup. All rights reserved. Privacy policy. Website developed by innovationpoint