DST S.A.
  • About Us
    • Who we are
    • History
    • Financial information
    • Certifications
    • Social Responsibility and Environment
    • Recruitment
    • MANAGEMENT POLICY
  • Activity Areas
  • Portfolio
    • All the areas
    • Construction
    • Infrastructures
    • Water, Environment and Energy
  • Works in progress
    • All the areas
    • Construction
    • Infrastructures
    • Water, environment and energy
  • Contact Us
  • en
    • English (US)
    • Português
    • Français
    • Español
Back
Viana do Castelo
Fortissue Paper Mill
Indústria e Logística
Data Sheet
Construction of a paper mill with a mezzanine and an office area in the industrial zone of Alvarães, Viana do Castelo. Preparatory work was carried out (earthworks, land grading to allow the movement of machines). In terms of foundations, pile foundations were executed - CFA piles, since the area was a landfill site, and therefore the soil was unstable. The superstructure was made of prefabricated concrete, and steel structures were needed only as secondary support for the façades. Three trenches were made, two of which with bored pile walls. The building consists of two sections, being one for offices with a total height lower than the rest of the building. The second part is the mill, an area composed by an open space with a mezzanine. The floors were made of fibre reinforced concrete without joints.
+ learn more
Client
Suavecel
Request Technical Data Sheet
Back
Viana do Castelo
Fortissue Paper Mill
Indústria e Logística
/
Data Sheet
Construction of a paper mill with a mezzanine and an office area in the industrial zone of Alvarães, Viana do Castelo. Preparatory work was carried out (earthworks, land grading to allow the movement of machines). In terms of foundations, pile foundations were executed - CFA piles, since the area was a landfill site, and therefore the soil was unstable. The superstructure was made of prefabricated concrete, and steel structures were needed only as secondary support for the façades. Three trenches were made, two of which with bored pile walls. The building consists of two sections, being one for offices with a total height lower than the rest of the building. The second part is the mill, an area composed by an open space with a mezzanine. The floors were made of fibre reinforced concrete without joints.
+ learn more
Client
Suavecel

TECHNICAL SHEET

Construction of a paper mill with a mezzanine and an office area in the industrial zone of Alvarães, Viana do Castelo. Preparatory work was carried out (earthworks, land grading to allow the movement of machines). In terms of foundations, pile foundations were executed - CFA piles, since the area was a landfill site, and therefore the soil was unstable. The superstructure was made of prefabricated concrete, and steel structures were needed only as secondary support for the façades. Three trenches were made, two of which with bored pile walls. The building consists of two sections, being one for offices with a total height lower than the rest of the building. The second part is the mill, an area composed by an open space with a mezzanine. The floors were made of fibre reinforced concrete without joints.
Cliente
Suavecel
Technical Sheet Request

Call us

or

Write us

cofinacied by  
SetWidth480-compete2020.png
SetWidth480-portugal2020.png
SetWidth480-UE2020.png
Projetos Financiados ID&T
Baterias 2030
ReNew
New Generation Storage
 
SetWidth480-prr.png
SetWidth480-logo-RP-branco-Prancheta-1.png
SetWidth480-ue-next.png
PRR Portugal
R2UTechnologies | modular system
Follow us on social networks
Construction charter
DOMINGOS DA SILVA TEIXEIRA, S.A. 2846 - PUB
© 2022 dstgroup. All rights reserved. Privacy policy. Website developed by innovationpoint