DST S.A.
  • About Us
    • Who we are
    • History
    • Financial information
    • Certifications
    • Social Responsibility and Environment
    • Recruitment
    • MANAGEMENT POLICY
  • Activity Areas
  • Portfolio
    • All the areas
    • Construction
    • Infrastructures
    • Water, Environment and Energy
  • Works in progress
    • All the areas
    • Construction
    • Infrastructures
    • Water, environment and energy
  • Contact Us
  • en
    • English (US)
    • Português
    • Français
    • Español
Back
Braga
New Cell of the BRAVAL sanitary landfill
Infraestruturas Ambientais
Data Sheet
The contract included the elaboration of the final design of the expansion of the Mechanical and Biological Treatment of Solid Waste Unit; supply and assembly of mechanical, electromechanical, electrical and hydraulic equipment and execution of civil construction works for the following units: Mechanical treatment unit (MT) with capacity to receive and treat 50 thousand tons of solid waste annually; Anaerobic degradation unit with a capacity for biological recovery of 20 thousand tons of separated biodegradable waste per year in the Mechanical Treatment unit; Unit for recovery of sludge produced in the Anaerobic Degradation unit; Biogas energy recovery unit.
+ learn more
Client
BRAVAL - Valorização e Tratamento de Resíduos Sólidos, S.A.
Time of execution
8 months
Request Technical Data Sheet
Back
Braga
New Cell of the BRAVAL sanitary landfill
Infraestruturas Ambientais
/
Data Sheet
The contract included the elaboration of the final design of the expansion of the Mechanical and Biological Treatment of Solid Waste Unit; supply and assembly of mechanical, electromechanical, electrical and hydraulic equipment and execution of civil construction works for the following units: Mechanical treatment unit (MT) with capacity to receive and treat 50 thousand tons of solid waste annually; Anaerobic degradation unit with a capacity for biological recovery of 20 thousand tons of separated biodegradable waste per year in the Mechanical Treatment unit; Unit for recovery of sludge produced in the Anaerobic Degradation unit; Biogas energy recovery unit.
+ learn more
Client
BRAVAL - Valorização e Tratamento de Resíduos Sólidos, S.A.
Time of execution
8 months

TECHNICAL SHEET

The contract included the elaboration of the final design of the expansion of the Mechanical and Biological Treatment of Solid Waste Unit; supply and assembly of mechanical, electromechanical, electrical and hydraulic equipment and execution of civil construction works for the following units: Mechanical treatment unit (MT) with capacity to receive and treat 50 thousand tons of solid waste annually; Anaerobic degradation unit with a capacity for biological recovery of 20 thousand tons of separated biodegradable waste per year in the Mechanical Treatment unit; Unit for recovery of sludge produced in the Anaerobic Degradation unit; Biogas energy recovery unit.
Cliente
BRAVAL - Valorização e Tratamento de Resíduos Sólidos, S.A.
Prazo de Execução
8 months
Technical Sheet Request

Call us

or

Write us

cofinacied by  
SetWidth480-compete2020.png
SetWidth480-portugal2020.png
SetWidth480-UE2020.png
Projetos Financiados ID&T
Baterias 2030
ReNew
New Generation Storage
 
SetWidth480-prr.png
SetWidth480-logo-RP-branco-Prancheta-1.png
SetWidth480-ue-next.png
PRR Portugal
R2UTechnologies | modular system
Follow us on social networks
Construction charter
DOMINGOS DA SILVA TEIXEIRA, S.A. 2846 - PUB
© 2022 dstgroup. All rights reserved. Privacy policy. Website developed by innovationpoint